Calculating weather windows: Application to transit, installation and the implications on deployment success


R.T. Walker, J. van Nieuwkoop-McCall, L. Johanning, and R.J. Parkinsonb – Ocean Engineering, May 2013

Abstract

In order to fully utilise test sites, marine energy device developers must be able to deploy, maintain and decommission their equipment in a timely and cost effective manner. In addition, the marine energy industry is moving towards array deployments and whilst these deployments present an excellent opportunity to maximise resource usage whilst minimising the associated costs, for example of deployment, it is essential that said deployment is performed in a cost effective manner. Critical to this is the knowledge of the metocean conditions at the site and the weather window availability, particularly when this is coupled with vessel availability and downtime costs.

In this paper a method is presented based on a Weibull model which uses cumulative distributions of the mean duration of persistence of exceedance. The method discussed has been applied in a case study for the South West of England using site specific environmental parameters and empirical expressions to calculate the accessible periods. The outcomes from the case study are applied to identify the accessible periods and the waiting time for marine operations, and a discussion is made regarding the installation of wave energy devices at the south west Wave Hub.

Link

Advertisements

Leave a comment

Filed under Modeling, Operation and Maintenance

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s