OffshoreGrid: Techno-Economic Model for Future Offshore Electricity Transmission


P Kreutzkamp, J De Decker, N Picot 2012

Summary
This project investigated the most beneficial wind farm connection concepts for 126 GW in 321 offshore wind farms as expected for the year 2030. Based on this two highly efficient offshore grid designs were developed with modular building stones such as direct interconnectors, hub-to-hub connections, Tee-in solutions.

Link

Advertisements

Leave a comment

Filed under Economics

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s